Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.8390411
- Product Categories
- Friendly Links
- home > Supply > Texas manufacturers supply DBHZ2 series assembled cooling towers DBHZ2 cross-flow cooling tower - Teng Cheong Group
Texas manufacturers supply DBHZ2 series assembled cooling towers DBHZ2 cross-flow cooling tower - Teng Cheong Group
Information Name: | Texas manufacturers supply DBHZ2 series assembled cooling towers DBHZ2 cross-flow cooling tower - Teng Cheong Group |
Published: | 2011-08-31 |
Validity: | 180 |
Specifications: | According to customer requirements |
Quantity: | 1.00 |
Price Description: | |
Detailed Product Description: | Cross-flow cooling tower, DBHZ2 series assembled cooling towers DBHZ2 cross-flow cooling tower, DBHZ2 series assembled cooling towers Key Specifications / Special Features Specifications: Cross-flow cooling tower (crossfolw cooling tower) water falling from the tower top vertical, horizontal air flow through the water spray filler, air and water cooling towers orthogonal. Definition: a water cooling device. Water in the air flow within the heat exchange and mass transfer, resulting in decreased water temperature. Classification Design choice points Construction, installation points: 1) cooling tower installation process should pay attention to fire prevention, is strictly prohibited to use the tower and adjacent welding (or gas cutting) and other open flame, do not allow the presence of people smoking. Such as the use of fire, should take appropriate safety measures. 2) The cooling tower's foundation should be level, requiring pillar and the base surface perpendicular to the base surface height does not exceed ± 1mm. Center distance tolerance of ± 2mm. 3) When the tower assembly, said fastening bolts should not allow distortion of force to install, no leaks after assembly, leak. 4) cooling the feet and the base of Tata Steel to be embedded directly positioning welding, embedded steel plate should be level and firm. 5) cooling tower parts in the transport, storage process, it is not allowed on the ballast, not exposure, and pay attention to fire. 6) into the cooling tower, additional water outlet pipe and pipe supports should be set separately, to avoid the weight of the pipe to pass the tower. 7) The fan blades should be properly safeguarded to prevent deformation. Motor and transmission parts should be oiled, kept in the room. 8) To avoid the debris into the nozzle, orifice, before the assembly should be carefully cleaned. 9) cooling tower is installed, it should be clean pipe, filler surface, such as dirt and water catchment tray tower relics, and the system cleaned. |
Admin>>>
You are the 31968 visitor
Copyright © GuangDong ICP No. 10089450, Teng Cheong Group Shandong ventilation and air conditioning equipment factory muffler All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 31968 visitor
Copyright © GuangDong ICP No. 10089450, Teng Cheong Group Shandong ventilation and air conditioning equipment factory muffler All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility