Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.8390411
- Product Categories
- Friendly Links
- home > Supply > Supply DBHZ2 series assembled cooling towers DBHZ2 cross-flow cooling tower offer - Shandong Teng Cheong Group
Supply DBHZ2 series assembled cooling towers DBHZ2 cross-flow cooling tower offer - Shandong Teng Cheong Group
Information Name: | Supply DBHZ2 series assembled cooling towers DBHZ2 cross-flow cooling tower offer - Shandong Teng Cheong Group |
Published: | 2011-10-17 |
Validity: | 180 |
Specifications: | According to customer requirements |
Quantity: | 1.00 |
Price Description: | |
Detailed Product Description: | Cross-flow cooling tower, DBHZ2 series assembled cooling towers DBHZ2 cross flow cooling towers, DBHZ2 series assembled cooling towers Key Specifications / Special Features Product Specifications: Cross-flow cooling tower (crossfolw cooling tower) water falling from the tower top vertical, horizontal flow of air through the water spray filler, air and water cooling towers orthogonal. Definition: a water cooling device. Water in the air flow within the heat exchange and mass transfer, resulting in temperature drop. Classification Design elements used Construction, installation points: 1) cooling tower installation process should pay attention to fire prevention, non-use of the tower and adjacent welding (or gas cutting) and other open flames, smoking does not allow the presence of personnel. Such as the use of fire, should take appropriate safety measures. 2) cooling tower base should be kept level, requiring vertical pillar and the base surface, the base surface height does not exceed ± 1mm. Center distance tolerance for the ± 2mm. 3) The tower assembly, the bolts fastening said the deal is not allowed distortion forced to install, no leaks after assembly, leak. 4) cooling the feet and the base of Tata Steel to be embedded directly positioning welding, embedded steel plate should be level and firm. 5) cooling tower parts in the transport, storage process, it is not allowed on the ballast, not exposure, and attention to fire. 6) into the cooling tower, water outlet pipe and added pipe supports should be set separately to avoid the weight of the pipe to pass the tower. 7) The fan blades should be properly safeguarded to prevent deformation. Motor and transmission parts should be oiled, in indoor storage. 8) To avoid debris into the nozzle orifice, carefully clean before assembly. 9) After installation of cooling towers should be clean pipe, filler surface, such as dirt and water catchment tray tower relics, and the system clean. |
Admin>>>
You are the 31968 visitor
Copyright © GuangDong ICP No. 10089450, Teng Cheong Group Shandong ventilation and air conditioning equipment factory muffler All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 31968 visitor
Copyright © GuangDong ICP No. 10089450, Teng Cheong Group Shandong ventilation and air conditioning equipment factory muffler All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility