Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.8390411
- Product Categories
- Friendly Links
- home > Supply > Supply DBHZ2 assembled cooling tower DBHZ2 cross-flow cooling tower offer - Preferred Texas Teng Cheong Group
Supply DBHZ2 assembled cooling tower DBHZ2 cross-flow cooling tower offer - Preferred Texas Teng Cheong Group
Information Name: | Supply DBHZ2 assembled cooling tower DBHZ2 cross-flow cooling tower offer - Preferred Texas Teng Cheong Group |
Published: | 2012-02-28 |
Validity: | 180 |
Specifications: | According to customer requirements |
Quantity: | 0.00 |
Price Description: | |
Detailed Product Description: | Cross-flow cooling tower, DBHZ2 series assembled cooling towers DBHZ2 cross-flow cooling tower, DBHZ2 series assembled cooling towers Key Specifications / Special Features Product Specifications: Cross flow cooling tower water (crossfolw cooling tower) from the upper tower plummet, air levels of liquidity by tricking filler, air and water flow orthogonal to the cooling tower. Definition: a water cooling device. Water in its flow through the air heat exchange and mass transfer, resulting in fall in temperature. Classification Design selected points Construction, installation points: 1) cooling tower installation process should pay attention to the fire, open flame is prohibited in the tower body and its surrounding use of welding (or gas cutting), does not allow the presence of persons smoking. Such as the use of fire, and should take appropriate safety measures. 2) cooling tower base should be kept level, the requirements of the pillar and the base surface perpendicular to the base surface height difference does not exceed ± 1mm. Center distance tolerances of ± 2mm. 3) tower body assembly, the bolt response to said fastening is not allowed to force distorting the installation, shall not be assembled after air and water leakage. 4) cooling the the Tata feet and foundation embedded steel need to direct welding, embedded steel should be level and firmly. 5) cooling tower parts in the process of transportation, storage, and its not allowed on the ballast, not exposure, and attention to fire. 6) cooling tower into the outlet pipe and supplementary water pipes should be a separate set of pipe support, to avoid the weight of the pipe to pass the tower body. 7) The fan blades should take good care of to prevent deformation. The motor and transmission parts should be oiled, and stored indoors. 8) To avoid debris entering the nozzle orifice should be carefully cleaned prior to assembly. 9) After installation of cooling towers should be cleaned pipes, dirt and tower relics of the filler surface catchment tray, and system cleaning. |
Admin>>>
You are the 31968 visitor
Copyright © GuangDong ICP No. 10089450, Teng Cheong Group Shandong ventilation and air conditioning equipment factory muffler All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 31968 visitor
Copyright © GuangDong ICP No. 10089450, Teng Cheong Group Shandong ventilation and air conditioning equipment factory muffler All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility